No discussions found
Start your discussion
Share your thoughts or question with experts in your field
Start a discussion
Found 3 matching solutions for this experiment
Upstream tips |
Protocol tips |
Downstream tips |
-Store the unopened kit at 2-8 °C.
-Bring all reagents to room temperature before use.
-Reconstitute the Human Cytochrome c Standard with deionized or distilled water. Allow the standard to sit for a minimum of 15 minutes with gentle agitation prior to making dilutions. |
-When mixing or reconstituting protein solutions, always avoid foaming.
-Substrate Solution should remain colorless until added to the plate.
-Keep Substrate solution protected from light.
-Stop Solution should be added to the plate in the same order as the Substrate Solution.
-Wells that are green in color indicate that the Stop Solution has not mixed thoroughly with
the Substrate Solution. |
|
Upstream tips |
-Store the unopened kit at 2-8 °C.
-Bring all reagents to room temperature before use.
-Reconstitute the Human Cytochrome c Standard with deionized or distilled water. Allow the standard to sit for a minimum of 15 minutes with gentle agitation prior to making dilutions. |
Protocol tips |
-When mixing or reconstituting protein solutions, always avoid foaming.
-Substrate Solution should remain colorless until added to the plate.
-Keep Substrate solution protected from light.
-Stop Solution should be added to the plate in the same order as the Substrate Solution.
-Wells that are green in color indicate that the Stop Solution has not mixed thoroughly with
the Substrate Solution. |
Upstream tips |
Protocol tips |
Downstream tips |
|
ELISA kits (R&D Systems, Inc., Minneapolis, MN, USA) according to the manufacturer's instructions. Samples in 96-well microplates were read by a Benchmark plus microplate spectrophotometer (Bio-Rad Laboratories, Inc.) within 20 min after the reaction was stopped. Test samples and standards were measured in duplicate. Microplate manager version 5.2.1 software (Bio-Rad Laboratories, Inc.), which was equipped with the spectrophotometer, automatically calculated sample concentrations according to corresponding standard curves with four-parameter logistics and log-logit function. |
|
Protocol tips |
ELISA kits (R&D Systems, Inc., Minneapolis, MN, USA) according to the manufacturer's instructions. Samples in 96-well microplates were read by a Benchmark plus microplate spectrophotometer (Bio-Rad Laboratories, Inc.) within 20 min after the reaction was stopped. Test samples and standards were measured in duplicate. Microplate manager version 5.2.1 software (Bio-Rad Laboratories, Inc.), which was equipped with the spectrophotometer, automatically calculated sample concentrations according to corresponding standard curves with four-parameter logistics and log-logit function. |
Upstream tips |
Protocol tips |
Downstream tips |
-Store at 4°C for 6 months, at -20°C for 12 months.
-Avoid multiple freeze-thaw cycles.
-The standard solutions are best used within 2 hours. |
-The diluted Avidin-Biotin-Peroxidase Complex (ABC) solution should not be prepared more than 1 hour prior to the experiment.
-Prepare the substrate solution immediately before use or bring the pre-made substrate to room temperature.
-Sodium azide is an inhibitor of HRP. Do not include the azide in buffers or wash solutions if HRP-labeled conjugate is used for detection. |
|
Upstream tips |
-Store at 4°C for 6 months, at -20°C for 12 months.
-Avoid multiple freeze-thaw cycles.
-The standard solutions are best used within 2 hours. |
Protocol tips |
-The diluted Avidin-Biotin-Peroxidase Complex (ABC) solution should not be prepared more than 1 hour prior to the experiment.
-Prepare the substrate solution immediately before use or bring the pre-made substrate to room temperature.
-Sodium azide is an inhibitor of HRP. Do not include the azide in buffers or wash solutions if HRP-labeled conjugate is used for detection. |
Can't find the product you've used to perform this experiment? It would be great if you can help us by
Adding a product!